Share
- Share on Facebook
- Share on Telegram
- Share on LinkedIn
- Share on Twitter
- Copy link
Page url is copied
Our implementor has arrived onsite, and the set-up of the Mini-lab has now been completed. Training of the local staff began on 9 May. The Mini-Lab staff is scheduled to start receiving and analyzing samples between mid and end of June 2022.
Pictures of the Mini-Lab set up in Aweil, April 2022
The Mini-Lab installed in Aweil in April 2022.
© MSF
The Mini-Lab installed in Aweil in April 2022.
© MSF
The Mini-Lab installed in Aweil in April 2022.
© MSF
The Mini-Lab installed in Aweil in April 2022.
© MSF